Mobile Apps

M & T - Llano Seco Fish Screen Project

SIGN IN    SAVE TO MY DU    PRINT    AAA

Project Document Download / View


Public Meeting

Agenda (July 27, 2005 3:00-5:00Pm Glenn Phsasant Hall, 1522 Hwy 45 Glenn, CA)

PowerPoint Presentation   1   2  (Warning: Large file & long download time)

Summary Report


Historical Documents

January 1989
Upper Sacramento River Fisheries and Riparian Habitat Management Plan
(Note. Web page link not working anymore)

November 1993
Restoring Central Valley Streams: A Plan for Action – California Dept. of Fish & Game   (Note. Original PDF file link not working anymore)

April 14, 1995
Technical Memorandum from CH2MHILL to M&T Chico Ranch
re: M&T Chico Ranch Pump State Relocation Feasibility Study

June 1995
Butte Creek Water Supply and Fish Passage Study, Bureau of Reclamation

December 6, 1995
Draft Anadromous Fish Restoration Plan, A Plan to Increase Natural Production of Anadromous Fish in the Central Valley of California, U.S. Fish & Wildlife Service
(Note. Web page link not working anymore)

April 1996
Finding of No Significant Impact / Mitigated Negative Declaration and Draft Environmental Assessment/Initial Study for the M&T / Parrott Pumping Plant and Fish Screen Project

May 21, 1996
Agreement for Relocation of M&T / Parrott Pumping Plan Providing for Bypass of Flows in Butte Creek, executed May 21, 1996

September 2001
Initial Study and Proposed Mitigated Negative Declaration – M&T Ranch/Llano Seco Ranch/City of Chico Sacramento River Water Intake Stream Channel Maintenance

June 21, 2001
Technical Memorandum from Stillwater Sciences to M&T Chico Ranch, Sacramento River Conservation Area Forum and California Department of Water Resources, re: Final Draft of M&T Ranch and Llano Seco Wildlife Refuge Pump Intake



March 17 – 19, 2004
Workshop #2 – Technical Review and Recommendation Workshop

    D. Technical Memorandum #2 – MWH Americas
    1) Groundwater Model for Test Well
    2) Potential Water Supply Alternative – Scenarios 1-4
    3) Preliminary Cost Estimates, legal and economic discussion for Potential Water Supply Alternative – Scenarios 1-3
    4) M&T/Llano Seco Water Supply and Demand - City of Chico Wastewater TreatmentPlant Impacts
    5) Optional Fish Screen Criteria

    G. Information
    1) National Marine Fisheries Service – Southwest Region Fish Screening Criteria for Anadromous Salmonids – January 1997
    2) State of California – Resources Agency, Department of Fish and Game Fish Screening Criteria – June 19, 2000


February 16 – 18, 2005
Workshop #3 – Project alternatives and Feasibility Workshop

April 24 – 25, 2006
Workshop #4 – Conceptual Model and Project Proposal

    D. Report 2 - 2-D Modeling to Evaluate Potential River Training Works at M&T Pumping Plant Sacramento River, RM 197.5
    1) Report
    2) Appendix A
    3) Appendix B





October 26, 2011
Workshop #6

A. Workshop #6 Agenda

B. Workshop #6 Purpose of Meeting

C. Workshop #6 Meeting Notes

D. Steering Committee Contact Information

E. Power Point Presentations
  1. M&T/Llano Seco Fish Screen Short-term/Long-term Project – Post-Workshop 5 Update

  2. Rock Toe and Brush Revetment Update

  3. M&T/Llano Seco Fish Screen Short-term/Long-term Project Topographic & Bathymetric Surveys

  4. M&T Pump Station Intake Second Physical Model

  5. M&T Pump Project 2-Dimensional Modeling

  6. M&T Ranch Intake Improvements (No Mitigation Costs 2008 Dollars)

  7. Cost Slides Drawing Set
F. Phase III Two-Dimensional Modeling of M&T/Llano Seco Pumping Plant Reach, Sacramento River, RM 192.5, California (Hamilton City J-Levee Impacts/Two-dimensional Hydrodynamic Model Analysis), October 5, 2011

G. M&T Pump Station Intake Second Physical Model, Final Report, November 2011

H. Memorandum – Two-dimensional Sediment-transport Model of the M&T/Llano Seco Pumps Reach, June 7, 2012

I. SUMMARY REPORT – M&T/Llano Seco Fish Screen Facility, Short-Term/Long-Term Protection Project; Alternatives Evaluation, June 29, 2012 (including the following reports): 
  • Analysis of ADCP Data Collected at the M&T/Llano Seco Pumps Real in June 2011 at 19,500 cfs
  • Three-dimensional Numerical Flow analysis of the M&T Pumps Chico, California, July 2012
1. Vegetation Mitigation Monitoring Reports
  1. M&T/Llano Seco Pumping Plant Riparian Vegetation Mitigation Monitoring Report, January 2010
  2. M&T/Llano Seco Pumping Plant Riparian Vegetation Mitigation Monitoring Report, November 2010
  3. M&T/Llano Seco Pumping Plant Riparian Vegetation Mitigation Monitoring Report, October 2011
2. West Bank Revetment Inspection Reports
  1. Memorandum – M&T/Llano Seco Fish Screen Facility Short-Term Protection Project – Maintenance Inspection Report No. 1, November 29, 2010 (Rock-Toe/Brush Revetment)
  2. Memorandum – M&T/Llano Seco Fish Screen Facility Short-Term Protection Project – Maintenance Inspection Report No. 2, May 8 2012 (Rock-Toe/Brush Revetment)
3. Hydrographic and Topographic Surveys
  1. M&T/Llano Seco Fish Screen Facility Short-Term/Long-Term Protection Project – Survey Report 1, March 18, 2010 (Bathymetric Survey) 
  2. Memorandum – June 7-9, 2011 resurvey of M&T/Llano Seco Pumping Plan and City of Chico Outfall Reach of the Sacramento River, July 11, 2011
  3. June 26, 2012 Resurvey of M&T/Llano Seco Pumping Plant and City of Chico Outfall Reach of the Sacramento River, July 16, 2012
4. Permits
  1. Extension of Lake or Streambed Alternation Agreement – Notification No. 1600-2006-0430-R2 (Five-Year Extension for the Rock-Toe/Brush Revetment along the west bank of the Sacramento River at River Mile 193, May 25, 2012)


Last updated:   12/12/2012

SIGN IN    SAVE TO MY DU    PRINT    AAA

Free DU Decal

Receive a free DU decal when you signup for our free monthly newsletter.